Review the usable bench space, entrance and heater position together. The layout should reflect the intended number of users and the room around the cabin.
Confirm the exact heater and its operating method for the model you're ordering. Check any additional components against the equipment list and instructions.
Discuss the wood, glazing and interior finish for the cabin. Cleaning access and routine care are worth considering while the design is still being agreed.

Your installer will need the ventilation and clearance requirements for the selected equipment. Review them before the site is prepared.
Check the control location and available settings. The instructions and labels should match the cabin and heating configuration supplied.
Plan the waterproofing and drainage before the cabin is built, because the steam generator and drain position drive the layout.
Smartmak býður upp á heildarlausnir fyrir sérsniðnar gufubaðsfyrirtæki og einstaklingsbundnar aðstæður. Sjáðu hvernig við störfum: